MYNORTHWEST NEWS

Huge tunnel drill makes its way to Seattle waterfront

Apr 2, 2013, 10:23 AM | Updated: 5:13 pm

An aerial view of the SR 99 tunneling machine at the manufacturing plant in Osaka, Japan in December 2012. Giant cranes lift the 57.5-foot-diameter cutterhead into place on the SR 99 tunnel boring machine in Japan. Crews in Japan remove the 57.5-foot-diameter cutterhead from Bertha, the machine that will dig the SR 99 tunnel in Seattle. Pieces of Bertha, the machine that will dig the SR 99 tunnel in Seattle, await their departure from Osaka, Japan aboard the Jumbo Fairpartner in March 2013. Crews in Osaka, Japan load pieces of Bertha, the SR 99 tunneling machine, on a ship bound for Seattle in March 2013. Bertha pulls into Elliott Bay Tuesday afternoon. Bertha spent about two weeks at sea before pulling into Elliott Bay on Tuesday afternoon. Bertha sits atop a ship parked out in Elliott Bay Tuesday afternoon. The five story tall drill spent about two weeks at sea traveling from Osaka, Japan.

Seattle fire boat welcomes Bertha, a five story tall drill set to dig a new tunnel under downtown Seattle. (Port of Seattle)

(Port of Seattle)

Seattle is welcoming the huge drill that will dig out earth and make way for the city’s new SR 99 tunnel.

The five-story tall tunneling machine, named Bertha, has spent two weeks making its way from Osaka, Japan to Elliott Bay. Seattle Fire Department boats welcomed Bertha to the area with a water show.

A ship, the Jumbo Fairpartner, carried the $80 million machine across the Pacific Ocean. The Washington State Department of Transportation has listed out the perfect vantage points if you’re interested in seeing Bertha’s arrival or watching her unloading.

If you can’t make it down to a view point or the waterfront, the WSDOT is setting up a live webcam pointed at the Port of Seattle’s Terminal 46. You can also follow Bertha’s journey on Twitter @BerthaDigsSR99.

Bertha posted an update on Twitter at 12:20pm – “Entering Elliott Bay now. The Space Needle looks like a thinner version of my Uncle Ned.” And at 1:10pm – “It’s been a long trip. I’m starving. I don’t suppose those barges to the south of me could spare any dirt. You know, just a little snack.”

WSDOT says it’ll take several weeks to remove all 41 of Bertha’s pieces from the ship. Crews will move them to predetermined storage locations in the work zone.

“Construction crews preparing for this machine’s arrival have accomplished an unbelievable amount of work over the past 18 months,” said state Transportation Secretary Lynn Peterson. “Thanks to their hard work, tunneling will begin on schedule.”

As soon as an 80 foot deep pit is completed, Bertha’s pieces will be lowered underground, reassembled, and tested before tunneling begins. This process is expected to take two or three months.

The new section of Highway 99 replacing the Alaskan Way Viaduct will have a diameter of nearly 58 feet.

You might also like:
State orders removal of derelict Tacoma ship

The Associated Press contributed to this report.

MyNorthwest News

Photo: Lewis and Clark High School students thought quickly to save their track coach's life....

Julia Dallas

Spokane high school students save track coach’s life after his heart stops

Two Spokane high school students used their quick thinking and past training to save their track coach's life last week.

1 minute ago

Image: Brightly colored eggs are set on a table on the South Lawn of the White House in Washington,...

Ted Buehner

Expect good Easter weekend weather for egg hunts, chilly evening Mariners games

Both Saturday and Sunday of Easter weekend will feature temperatures warming to around 60 degrees across much of Western Washington.

12 hours ago

Taylor Swift performs onstage during the Taylor Swift | The Eras Tour at Lumen Field on July 22, 20...

Micki Gamez, KIRO Newsradio and Bill Kaczaraba, MyNorthwest

Seattle tourism dollars break records following All-Star Week, Taylor Swift

It was a record-setting year for dollars flowing into Seattle from tourists.

13 hours ago

Image: A bridge in Carnation....

Julia Dallas

Carnation frustrated with Seattle again after 8th false emergency alarm induces widespread panic

Carnation citizens have faced a series of panic-inducing alarms after SPU's system for the Tolt Dam falsely sounded eight times.

15 hours ago

Grocery store shopper...

Bill Kaczaraba

Ways to deal with Seattle grocery store sticker shock

Seattle grocery store sticker shock continues to play havoc on locals, but there are ways to counter high prices.

15 hours ago

belltown hellcat social media...

Frank Sumrall

Infamous ‘Belltown Hellcat’ social media influencer charged with reckless driving

The social media influencer has been accused of driving 107 miles per hour through Belltown in a Dodge Hellcat.

16 hours ago

Huge tunnel drill makes its way to Seattle waterfront