Photo Galleries

Vehicles make it past debris from the Oso mudslide heading eastbound, Tuesday, April 29, 2014 in Oso, Wash. The local access road has opened through the Oso mudslide, connecting the stretch of Highway 530 blocked by the March 22 landslide. (AP Photo/The Seattle Times, Ellen M. Banner, Pool) Trucks sitting on the hillside that slid in Oso can be seen from a one-lane road, Tuesday, April 29, 2014 in Oso, Wash. The local access road has opened through the Oso mudslide, connecting the stretch of Highway 530 blocked by the March 22 landslide. (AP Photo/The Seattle Times, Ellen M. Banner, Pool) A $50-million settlement was announced between the state and victims of the deadly Oso landslide, the day before a jury was set to convene in trial. (AP) Vehicles make it past debris from the Oso mudslide heading eastbound, Tuesday, April 29, 2014 in Oso, Wash. The local access road has opened through the Oso mudslide, connecting the stretch of Highway 530 blocked by the March 22 landslide. (AP Photo/The Seattle Times, Ellen M. Banner, Pool)
New access road opens at Oso mudslide