MYNORTHWEST NEWS

Alaskan Way Viaduct sinks 1 inch in a few weeks; WSDOT says ‘it’s still safe’

Dec 8, 2014, 7:00 AM | Updated: Dec 10, 2014, 10:48 pm

The mission to rescue Bertha, the world’s largest boring machine, which is still sitting quie...

The mission to rescue Bertha, the world's largest boring machine, which is still sitting quietly beneath the surface of Seattle, might be causing the Alaskan Way Viaduct to sink. (WSDOT Photo)

(WSDOT Photo)

Seattle’s Alaskan Way Viaduct is sinking, dropping as much as one inch in just a few weeks.

The mission to rescue Bertha, the world’s largest boring machine, which is still sitting quietly beneath the surface of Seattle, might be the cause.

When all the parts of the viaduct sink evenly, at the same pace, it’s not a big deal. Tests over the weekend by the Washington State Department of Transportation show the settling is uneven, which is more risky than if the soil settled uniformly.

It has prompted the SR-99 tunnel contractors to stop pumping out the ground water, “dewatering” near the pit. Crews need to dig a 120-foot hole to reach and place the damaged head of the boring machine.

“When you remove water from underground, there’s a tendency for the ground and the mechanics of it to consolidate. The soils could be consolidating immediately adjacent to the access pit,” says David Sowers with the WSDOT.

According to Sowers, the viaduct is still safe for cars and construction.

“We don’t think the viaduct is in any risk to the traveling public right now. It’s still safe. We’re not taking any measures to close the viaduct based on one inch of movement.”

MyNorthwest News

Michelle Gutierrez, organizer with Service Employees International Union joined with the Denver Pos...

Sam Campbell, KIRO Newsradio and Bill Kaczaraba, MyNorthwest

More freedom for Washington workers as noncompete contracts are challenged

The Federal Trade Commission has swung its regulatory hammer, striking down nearly all non-compete agreements.

3 hours ago

boeing q1 loss...

Frank Sumrall

Boeing posts $355 million loss in Q1 after series of company crises

"We are in a tough moment," Boeing CEO David Calhoun said as the company announced a $355 million loss in 2024's Q1.

6 hours ago

Photo: Lund Hill solar farm in Klickitat County, Washington, the state’s largest photovoltaic pla...

Julia Dallas

Washington receives over $150M to implement solar, lower energy costs

On Monday, The EPA announced Washington has been selected to get $156M to develop long-lasting solar programs for low-income communities.

19 hours ago

Image: Buddy Booth is seen as a young adult. Episodes of Season 2 of The Letter from KSL Podcasts a...

Amy Donaldson - executive producer, KSL Podcasts

The Letter Season 2: Sense of dread precedes second 1982 Millcreek Canyon murder

The second episode of the second season of The Letter, "Ripple Effect," details the second man killed in a 1982 double murder.

20 hours ago

Photo: West Seattle High School students held a pro-Palestinian protest....

James Lynch

Western Washington students walk out against Israel-Hamas war

Around 100 West Seattle High School students joined other groups across the nation in protesting against the Israel-Hamas war.

23 hours ago

Boeing production floor...

Heather Bosch

Boeing engineers allege retaliation over safety concerns

Two Boeing engineers have alleged retaliation by the company’s management after they insisted on a re-evaluation of work on the 787 and 777.

23 hours ago

Alaskan Way Viaduct sinks 1 inch in a few weeks; WSDOT says ‘it’s still safe’