AP

Georgia nuclear plant gets OK to load fuel at new reactor

Aug 2, 2022, 10:08 PM | Updated: Aug 3, 2022, 10:21 am

FILE - The cooling towers of two new nuclear reactors at Plant Vogtle in Waynesboro, Ga., are pictu...

FILE - The cooling towers of two new nuclear reactors at Plant Vogtle in Waynesboro, Ga., are pictured Friday, March 22, 2019. The U.S. Nuclear Regulatory Commission announced Wednesday, Aug. 3, 2022, that it had approved plans to load radioactive fuel into one of the new reactors, which could clear the way for the first new nuclear power plant built in the United States in decades to come online by March 2023. (Michael Holahan/The Augusta Chronicle via AP, File)

(Michael Holahan/The Augusta Chronicle via AP, File)

ATLANTA (AP) — A nuclear power plant being built in Georgia can begin loading radioactive fuel into one of its two new reactors, federal regulators said Wednesday, a key step toward generating electricity at the first new nuclear reactor built in decades in the United States.

The Southern Nuclear Operating Co. hopes in October to begin loading fuel into its third reactor at Plant Vogtle, near Waynesboro, Tom Fanning, CEO of Southern Nuclear’s parent company, Atlanta-based Southern Co, said last week.

Andrea Veil, director of the NRC’s Office of Nuclear Reactor Regulation, said inspectors “independently verified that Vogtle Unit 3 has been properly built and will protect public health and safety when it transitions to operation.” She said they will keep “a close eye” on the unit moving forward.

A third and a fourth reactor were approved for construction at Vogtle by the Georgia Public Service Commission in 2012, and the third reactor was supposed to start generating power in 2016. Now, the schedule calls for that to happen by the end of March 2023. The cost of the third and fourth reactors has climbed from an original cost of $14 billion to more than $30 billion.

The operating company will operate the plant on behalf of owners including fellow Southern Co. subsidiary Georgia Power Co., Oglethorpe Power Corp., the Municipal Electric Authority of Georgia and the city of Dalton. Oglethorpe and MEAG would sell power to cooperatives and municipal utilities across Georgia, as well in Jacksonville, Florida, and parts of Alabama and the Florida Panhandle.

Approval of the third reactor was hung up in recent months because much of its wiring had to be redone after federal regulators found major flaws in it. Southern Co. also had fallen behind on inspection documents that had to be completed before the NRC could sign off.

Fanning and Southern Chief Financial Officer Daniel Tucker said July 28 that before fuel could be loaded, the company also needed to remove scaffolding, temporary lighting and other construction equipment and get the nuclear containment unit into “pristine condition” before loading fuel.

Georgia Power said Thursday that fuel is already on site. After it’s loaded, operators will test to make sure that the reactor can operate at the extreme temperature and pressure needed to split atoms. Once those tests are done, operators will link up the plant to the electrical grid.

Georgia Power customers are already paying part of the financing cost and state regulators have approved a monthly rate increase of $3.78 a month as soon as the third unit begins generating power. But the Georgia Public Service Commission will decide later who pays for the remainder of the costs.

The milestone comes as the other owners of Vogtle seek to shift costs onto Georgia Power. Both Oglethorpe and MEAG sued Georgia Power in June, claiming the company was trying to bilk them out of nearly $700 million by unilaterally changing a contract.

Georgia Power owns 45.7% of the two reactors, compared to Oglethorpe’s 30% and MEAG’s 22.3%. The city of Dalton’s utility owns the remaining 1.6% and hasn’t sued.

Under a 2018 deal, Georgia Power agreed to assume all cost overruns above a certain level. In exchange, the co-owners would sell part of their ownership shares to Georgia Power. Oglethorpe and MEAG say projected overruns have reached that level, but Georgia Power claims the threshold is $1.3 billion higher than the level claimed by the co-owners.

If Georgia Power loses, the shareholders of Southern Co. would most likely have to absorb more losses.

Vogtle is the only nuclear plant under construction in the United States. Its costs and delays could deter other utilities from building such plants, even though they generate electricity without releasing climate-changing carbon emissions.

“These new units remain a strong long-term investment for this state, and, once operating, are expected to provide customers with a reliable and resilient, clean, emission-free source of energy for the next 60 to 80 years,” Georgia Power CEO Chris Womack said in a statement. “That’s why we’ve been so committed to getting this project done right — it’s about serving our customers today and for decades to come.”

___

Follow Jeff Amy at http://twitter.com/jeffamy.

Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

AP

Photo: Homeland Security Secretary Alejandro Mayorkas is sworn-in before the House Committee on Hom...

the MyNorthwest Staff with wire reports

Senate dismisses two articles of impeachment against Homeland Security secretary, ends trial

The Senate dismissed impeachment charges against Homeland Security Secretary Alejandro Mayorkas, as Republicans pushed to remove him.

6 hours ago

idaho gender-affirming care...

Associated Press

Supreme Court allows Idaho to enforce its ban on gender-affirming care for transgender youth

The Supreme Court is allowing Idaho to enforce its ban on gender-affirming care for transgender youth while lawsuits over the law proceed.

2 days ago

Image: Former President Donald Trump speaks to the press in Manhattan state court in New York City ...

Associated Press

Trump’s hush money trial gets underway; 1st day ends without any jurors selected

The historic hush money trial of Donald Trump got underway Monday with the arduous process of selecting a jury to hear the case.

2 days ago

Photo: Israeli Iron Dome air defense system launches to intercept missiles fired from Iran, in cent...

Tia Goldenberg and Josef Federman, The Associated Press

Israel is quiet on next steps against Iran — and on which partners helped shoot down missiles

On Sunday, Israel's leaders credited an international military coalition with helping thwart a direct attack from Iran.

3 days ago

Early phases of Iran's drone attack against Israel. (Photo: Getty Images)...

Associated Press

The Latest | Iran launches its first direct military attack against Israel

Iran launched its first full-scale military attack against Israel on Saturday, sending drones toward Israel.

4 days ago

Early phases of Iran's drone attack against Israel. (Photo: Getty Images)...

Associated Press

BREAKING: White House confirms Iran drone attacks towards Israel

JERUSALEM (AP) — The White House says it will provide unspecified support for Israel’s defense against an ongoing airborne attack from Iran. National Security Council spokesperson Adrienne Watson said in a Saturday statement that “Iran has begun an airborne attack against Israel.” She added: “The United States will stand with the people of Israel and […]

4 days ago

Georgia nuclear plant gets OK to load fuel at new reactor