AP

NASA fixing moon rocket leaks, hoping for Sept. launch try

Sep 7, 2022, 11:30 PM | Updated: Sep 8, 2022, 12:16 pm

The NASA moon rocket as stands on Pad 39B for the Artemis 1 mission to orbit the Moon at the Kenned...

The NASA moon rocket as stands on Pad 39B for the Artemis 1 mission to orbit the Moon at the Kennedy Space Center, Tuesday, Sept. 6, 2022, in Cape Canaveral, Fla. No new launch date has been scheduled as of today. (AP Photo/John Raoux)

(AP Photo/John Raoux)


              The NASA moon rocket as stands on Pad 39B for the Artemis 1 mission to orbit the Moon at the Kennedy Space Center, Tuesday, Sept. 6, 2022, in Cape Canaveral, Fla. No new launch date has been scheduled as of today. (AP Photo/John Raoux)
            
              The NASA moon rocket as stands on Pad 39B for the Artemis 1 mission to orbit the Moon at the Kennedy Space Center, Tuesday, Sept. 6, 2022, in Cape Canaveral, Fla. No new launch date has been scheduled as of today. (AP Photo/John Raoux)

CAPE CANAVERAL, Fla. (AP) — NASA is replacing leaky seals in its moon rocket at the pad in hopes of launching it on its first test flight by the end of this month.

Managers said Thursday they will conduct another test after the repairs to ensure all hydrogen fuel leaks are plugged. If that test goes well — and if the Space Force extends a flight safety waiver — then NASA could take another stab at launching the 322-foot rocket in late September. Otherwise, the rocket will return to the hangar for additional work, delaying liftoff until at least October.

A series of hydrogen fuel leaks and other problems halted back-to-back launch attempts last week.

The Space Launch System rocket — the most powerful ever built by NASA — holds a crew capsule with three test dummies. The space agency wants to send the capsule into lunar orbit on a trial run, before putting astronauts on the next flight, in 2024. That around-the-moon mission would pave the way for the first human moon landing in 50 years, currently scheduled for 2025.

“We need to get the tanking test done and then we’ll have to look at what is the realism and schedule” to make a launch attempt as early as Sept. 23, said Jim Free, who’s in charge of NASA’s exploration systems development.

To launch in late September, NASA needs the OK from the Space Force in Cape Canaveral, which oversees the rocket’s self-destruct system. Batteries are needed to activate the system if the rocket veers off course toward populated areas. These batteries must be retested periodically, and that can only be done in the hangar. The military would have to extend the certification of those batteries by an extra two weeks or more to avoid moving the rocket back to the hangar.

But every time the rocket moves between the hangar and launch pad adds “routine wear and tear, and I don’t want to do that” unless necessary, said chief engineer John Blevins. There already have been three trips to the pad this year for practice countdowns and, most recently, the thwarted launch attempts of Aug. 29 and Saturday.

Engineers are hopeful that replacing a pair of seals in the hydrogen fuel lines at the bottom of the rocket will take care of any lingering leaks.

As an extra precaution, the launch team plans “a kindler and gentler approach to tanking” during the final phase of the countdown, slowing the flow of fuel at times to reduce stress on the seals, according to Mike Bolger, a program manager.

“We’re optimistic that we can knock this problem flat,” he told reporters.

Running years late and billions over budget, NASA’s new lunar exploration program is named Artemis after Apollo’s twin sister in Greek mythology. Twelve astronauts walked on the moon back in the late 1960s and early 1970s during NASA’s Apollo program.

___

The Associated Press Health and Science Department receives support from the Howard Hughes Medical Institute’s Department of Science Education. The AP is solely responsible for all content.

Copyright © The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

AP

Image: A cargo ship is stuck under the part of the structure of the Francis Scott Key Bridge after ...

Associated Press

Authorities identify 2 bodies recovered at site of Baltimore bridge collapse

A major bridge in Baltimore snapped and collapsed after a container ship rammed into it early Tuesday, and several vehicles fell into the river below.

14 hours ago

Photo: Mountaineer Jim Whittaker has died at 95....

Gene Johnson, The Associated Press

Lou Whittaker, among the most famous American mountaineers, has died at age 95

Lou Whittaker, a legendary American mountaineer who helped lead ascents of Mount Everest, K2 and Denali, has died at age 95.

15 hours ago

File photo: Former Sen. Joe Lieberman speaks in Washington on Jan. 18, 2024....

Associated Press

Former Sen. Joe Lieberman, Democrats’ VP pick in 2000, dead at 82

Former U.S. Sen. Joe Lieberman of Connecticut, who nearly won the vice presidency on the Democratic ticket with Al Gore in 2000, has died.

15 hours ago

islamic state attack...

Vanessa Gera, The Associated Press

What we know after the Islamic State group claims responsibility for Moscow massacre

The Islamic State group has claimed responsibility for an attack on a suburban Moscow concert hall that killed at least 133 people.

4 days ago

Moscow shooting...

The Associated Press

Russia: 60 dead, 145 injured in concert hall raid; Islamic State group claims responsibility

Assailants burst into a concert hall in Moscow on Friday and sprayed the crowd with gunfire, killing over 60 people, injuring more than 100.

6 days ago

Photo: Britain's Kate, Duchess of Cambridge visits 282 (East Ham) Squadron, RAF Air Cadets, Cornwel...

Associated Press

Kate Middleton announces she has cancer, is undergoing chemotherapy

Kate Middleton, Princess of Wales, says she is undergoing chemotherapy to treat cancer. She has been out of view since Christmas.

6 days ago

NASA fixing moon rocket leaks, hoping for Sept. launch try