During the weekend of Sept. 22-23, crews closed all lanes of southbound SR 167 between I-405 and South 180th Street to install a new fish-passable culvert underneath the roadway. The fish culvert is 56 feet long, 14 feet wide and 10 feet tall. This work is part of ongoing construction for the I-405/SR 167 Interchange Direct Connector Project in Renton. Photo taken September 2018 (Photo from Flickr @WSDOT)