MYNORTHWEST NEWS

Downtown’s Pacific Place redevelopment plan to create office space falls through

Sep 6, 2022, 4:18 PM | Updated: Apr 5, 2023, 1:37 pm

redevelopment...

Photo from Flickr

In an effort to revitalize the in-person shopping experience and provide a new use to the now empty storefronts, plans were created to renovate the Pacific Place shopping center to include office space, as reported by The Seattle Times. Now though, those plans have hit a hitch as Pacific Place shopping center said the proposal is off the table.

With the pandemic leaving malls and shopping centers empty as patrons sheltered in their homes from the COVID-19 virus, a large number of storefronts were left empty as retailers closed down due to the lack of traffic. Mall attendance has been in steady decline for a while now, with the rise of online shopping taking a bulk of the business, but for many, the pandemic restrictions were the breaking point.

Downtown Seattle attempts to entice workers from remote settings with a revitalized atmosphere

The mall had already been struggling to maintain tenants, going from 50 stores and restaurants in 2017 to only 21 in January 2020, right before the pandemic hit.

Hudson Pacific Properties Inc., a Los Angeles-based real estate developer, put together the $260 million plan to redevelop the mall to include office space in the building, even going to far as filing a building and land use pre-application to convert the second through fifth floors away from retail space.

Now that plan has been put on hold indefinitely, which is currently being reported by the Puget Sound Business Journal, crediting a source with knowledge of the redevelopment proposal.

Hudson Pacific Properties, Madison Marquette, the owner of Pacific Place, and Seattle developer Pine Street Group, which originally developed the mall, did not respond to questions about the sale, redevelopment, or why the plan might have fallen through.

How much the offices are even needed is another question, as the Downtown Seattle Association said July saw Seattle office workers returning to downtown at only about 40% of 2019 totals. The organization stated that employees are returning to downtown at its highest rate since the start of the pandemic and are hopeful those numbers will continue to rise.

While remote-based employment did become a popular solution for working through a pandemic, only 18% of employees want to work remotely full-time, said one survey done by the DSA, as the reasoning as to why developing office space might be useful.

MyNorthwest News

wa inmate assault transgender...

Charlie Harger

Former inmate who says transgender cellmate assaulted her wins federal case against WA prisons, attorney says

A former inmate said she was sexually assaulted by her cellmate at the women’s prison in Gig Harbor. She won her federal civil rights case against the state.

13 minutes ago

sequim meth arrest...

Jason Sutich

Sequim man arrested after allegedly selling meth to detectives multiple times

A 51-year-old man was arrested in Sequim last week following a sting operation where he allegedly sold methamphetamine to detectives on multiple occasions.

54 minutes ago

Box truck rollover blocks four southbound I-5 lanes in DuPont...

Jason Sutich

SB I-5 reopens near DuPont after box truck rollover blocks 4 lanes

A rolled-over box truck is blocking the four left lanes of southbound I-5 in DuPont early Tuesday morning.

2 hours ago

orcas island ferry...

KIRO 7 News Staff

New vehicle restrictions at the Orcas Island ferry terminal due to bridge structural concerns

Heads up to drivers who use the Orcas Island ferry terminal. During a recent inspection, engineers found cracks in the steel under the transfer span.

2 hours ago

sound transit crosslake connection...

Julie Berg, KIRO 7

Sound Transit Crosslake Connection will be closed this weekend

Buses will replace Sound Transit Two Line trains between South Bellevue and International District/Chinatown on Saturday, Nov. 14 and Sunday, Nov. 15.

3 hours ago

pedestrian bridge...

Chris Sullivan

Shoreline pedestrian bridge delayed as faulty arch may need replacement

It looks like light rail riders will not be getting their pedestrian bridge over I-5 in Shoreline on time. The project is now running behind schedule.

3 hours ago

Downtown’s Pacific Place redevelopment plan to create office space falls through