MYNORTHWEST NEWS

‘Initiative on initiatives’ trails in early results

Nov 5, 2013, 3:58 PM | Updated: Nov 6, 2013, 6:09 am

An “initiative on initiatives” that would make it easier to get measures on the ballot trailed in early returns as counties across Washington state started tallying ballots.

About 60 percent of voters were rejecting Initiative 517 Tuesday night, but because of the state’s vote-by-mail system, many more ballots are left to count.

Initiative 517 would require that voters be allowed to have their say on any proposal that qualifies for the ballot, even if a lawsuit has been filed against it. The initiative also would give supporters a year, instead of the current six months, to collect signatures, and it would make it a misdemeanor to interfere with the signature-gathering process.

Backers of I-517 say the extra time is needed to encourage grassroots politics and to collect the increasing number of signatures needed to qualify for the ballot. Initiative critic Holly Chisa questioned that.

“With initiative, after initiative, after initiative qualifying for the ballot over the years, there doesn’t seem to be a difficulty in getting an initiative on the ballot or for signature gatherers to have an opportunity to gather those signatures.”

Initiative 517 would also criminalize the act of interfering with signature gatherers and includes a list of prohibited behavior, such as stalking, striking, shoving, spitting, blocking or intimidating signature gatherers. Chisa considers the proposed protections too broad and unnecessary.

Initiative promoter Tim Eyman filed I-517 last year just weeks after the state high court ruled that city laws allowing for red light traffic cameras are not subject to repeal by voters.

A state Supreme Court ruling in 1981 found that initiative backers have a constitutional right to gather signatures at a large regional shopping mall. A 2007 attorney general opinion notes a Court of Appeals ruling stating that right is tempered by the property’s owner’s ability to place “reasonable time, place and manner restrictions on the activity.”

The attorney general’s office has not stated whether I-517 would override time, place, or manner restrictions, or whether that would violate the constitutional rights of property owners, but initiative supporters have argued nothing in the proposal takes rights from business owners.

The Associated Press contributed to this report.

MyNorthwest News

wa inmate assault transgender...

Charlie Harger

Former inmate who says transgender cellmate assaulted her wins federal case against WA prisons, attorney says

A former inmate said she was sexually assaulted by her cellmate at the women’s prison in Gig Harbor. She won her federal civil rights case against the state.

40 minutes ago

sequim meth arrest...

Jason Sutich

Sequim man arrested after allegedly selling meth to detectives multiple times

A 51-year-old man was arrested in Sequim last week following a sting operation where he allegedly sold methamphetamine to detectives on multiple occasions.

1 hour ago

Box truck rollover blocks four southbound I-5 lanes in DuPont...

Jason Sutich

SB I-5 reopens near DuPont after box truck rollover blocks 4 lanes

A rolled-over box truck is blocking the four left lanes of southbound I-5 in DuPont early Tuesday morning.

2 hours ago

orcas island ferry...

KIRO 7 News Staff

New vehicle restrictions at the Orcas Island ferry terminal due to bridge structural concerns

Heads up to drivers who use the Orcas Island ferry terminal. During a recent inspection, engineers found cracks in the steel under the transfer span.

3 hours ago

sound transit crosslake connection...

Julie Berg, KIRO 7

Sound Transit Crosslake Connection will be closed this weekend

Buses will replace Sound Transit Two Line trains between South Bellevue and International District/Chinatown on Saturday, Nov. 14 and Sunday, Nov. 15.

3 hours ago

pedestrian bridge...

Chris Sullivan

Shoreline pedestrian bridge delayed as faulty arch may need replacement

It looks like light rail riders will not be getting their pedestrian bridge over I-5 in Shoreline on time. The project is now running behind schedule.

3 hours ago

‘Initiative on initiatives’ trails in early results