MYNORTHWEST NEWS

New Seattle tunnel machine to solve stinky problem

Feb 16, 2016, 8:39 PM | Updated: Feb 18, 2016, 12:12 pm

Swizy, the tunnel machine set to launch in Fremont, is named after the wife of one of the contracto...

Swizy, the tunnel machine set to launch in Fremont, is named after the wife of one of the contractors. (Richard D. Oxley, MyNorthwest)

(Richard D. Oxley, MyNorthwest)

Bertha may be sitting idle, but another boring machine in Seattle, Swizy, is ready to move.

“We are replacing the (Fremont) pipeline that has been in use for about 100 years,” said Annie Kolb-Nelson with King County’s wastewater treatment division. “It’s showing its age and is in need of replacement.”

Related: Seattle’s stinky problem that dumps into Lake Union when it rains

The pipeline being replaced, called the Fremont siphon, is a bit different than most running underneath Seattle. It’s located beneath the canal between Fremont and Queen Anne.

While one Seattle tunnel project has caused high-profile headaches, the area continues to experience a flurry of underground work as the county and city race to replace an aging infrastructure &#8212 the sewage and wastewater system in particular.

As it stands, Seattle’s wastewater system is outdated. When stormwater overwhelms the pipes, as it often does, the overflow, which includes waste, pours into area waterways such as the canal, Lake Union, Lake Washington and Puget Sound.

“During storms, this particular pipe carries up to 220 million gallons of wastewater a day,” Kolb-Nelson said. “It is one of the most heavily used pipes in our regional sewer system.”

That’s why the replacement projects are important.

“It will stop it from going into the canal,” said Marty Noble, King County’s project representative for the Fremont siphon.

“What we have now is a 138-inch line,” he added, noting it intercepts multiple lines from Seattle’s north end. “It takes all the UW flows, Fremont flows, Wallingford and all the other communities. That comes down Canal Street right now. It crosses the canal. That tunnel was put in in 1910.”

And Swizy won’t be the first sub-canal tunnel replaced in recent time. Another tunnel running underneath the canal at Ballard was recently replaced, using a slightly larger boring machine – one that could accommodate a crew. And the pipeline it replaced was made of wood.

Ultimately, all tunnels lead to Discovery Park where a wastewater treatment facility is located. But tunnels like Fremont’s are showing their age. Should the Fremont siphon fail, it could cause a major problem for north Seattle, and potentially the waterways.

Two new tunnels

Like Seattle’s famous Bertha boring machine, Swizy is brand new. But that is about all the two machines have in common. Bertha is the world’s largest boring machine while Swizy, named after the wife of one of the tunneling contractors, is the smallest in town. It bears the title of a “micro-tunneling machine” and is smaller than the machines digging tunnels for Seattle’s light rail, and smaller than the machine slated to bore from Ballard to Wallingford. It’s so small that a crew cannot fit inside. It’s controlled remotely.

And unlike the attitudes many Seattleites hold toward Bertha, Swizy has seemingly won over the hearts and minds of the Fremont community. Its christening on Tuesday drew a large crowd of neighbors, school-age, students and tourists who signed the machine. A German TV crew was on site to film the event &#8212 Swizy was engineered and built in Germany.

The Fremont siphon replacement project is the latest in a series of infrastructure updates throughout the region to be completed over 30 years. A tunnel slated to be bored underneath communities from Ballard to Wallingford will act as a reservoir to hold wastewater until it can be pumped into the system.

Swizy will be lowered to the bottom of a 90-foot-deep pit this week. It will then bore forward about 20 feet below the floor of the canal and emerge in a pit located in Queen Anne. It’ll repeat the journey and in the end, there will be two new tunnels fit for 60-inch pipes.

The project is expected to be completed in 2017.

MyNorthwest News

Auburn (1)...

James Lynch

Attorneys file notice of claim against City of Auburn on behalf of man punched during arrest

Attorneys representing 33-year-old Mauro Valles have filed a Notice of Claim, a precursor to a lawsuit, against the City of Auburn.

1 hour ago

Brown - transgender ban...

Julia Dallas

WA attorney general’s office appoints outside law firm to defend transgender sports ban

The Washington AG's Office announced it appointed an outside law firm to defend I-638, which will bar transgender girls from girls' school sports.

2 hours ago

Three boats 12 days stole...

Frank Lenzi

Man arrested 3 times after allegedly stealing boats around western WA, released after each arrest

A man stole three boats in 12 days last month and was released from jail three times, Everett Police said Thursday.

3 hours ago

Edmonds stolen gun...

KIRO 7 News Staff

Seattle man arrested with stolen gun after fleeing Edmonds police, department says

A 19-year-old Seattle man was arrested after running from a traffic stop in Edmonds early Thursday morning, according to police.

3 hours ago

shooting...

James Lynch

Seattle police looking for gunman after Rainier Valley shooting

Seattle police are searching for a gunman following a shooting Thursday afternoon in Rainier Valley.

4 hours ago

scooter...

MyNorthwest Staff

Mukilteo student riding scooter in bike lane hit by truck

A student riding their scooter in the bike lane on their way to school was hit by a truck in Mukilteo.

5 hours ago

New Seattle tunnel machine to solve stinky problem