CHOKEPOINTS

Chip sealing putting a chip on drivers’ shoulders

Aug 10, 2016, 5:35 AM

chip sealing...

WSDOT crews perform chip seal work on Washington roads. (WSDOT)

(WSDOT)

Washington road crews are smoothing things out on roads with chip sealing, but the strain on travel times may be putting a chip on drivers’ shoulders.

Chip sealing projects in Skagit, Whatcom, Snohomish and Island counties have been slowing drivers down this summer, mainly because the timing of the work. This is the first time the state has used chip sealing as Washington state looks to stretch limited resources while maintaining smooth roads.

Small Washington cities using cheaper solutions to pave their roads

A lot of the highways (State Routes 9, 20, 530, 542, 547 and 548) that crews are working on haven’t been repaved in more than 20 years.

While the chip sealing work is cheaper, it has to be done a certain way. It can only be completed during the day in the summer months when it’s warm enough for the seal to cure.

Drivers have been frustrated when they encounter the projects, but the state says it is trying to time the work at each location around non-peak travel times.

Some of the heaviest hit areas have been along SR 20 on Whidbey Island in the Morris Road area, and on SR 9 near SR 530 in Arlington. Washington State Department of Transportation reports it has taken drivers 30 minutes to an hour to get through some of these areas.

The good news, when it’s done, you won’t have to sit in traffic while crews are smoothing out the road. At least for another six to eight years, when the work will have to be done again. Chip sealing may be quite cheaper, but it also doesn’t last as long as the more expensive paving job. State crews will likely have to return to the roads to smooth them out once again in just a few years.

Tell us about a Chokepoint

Chokepoints

fire semi-truck crash Kittitas county...

MyNorthwest Staff

Semi-truck crash causes fire on eastbound I-90 in Kittitas County Tuesday

A single semi-truck crashed on eastbound I-90 Tuesday afternoon, causing a fire.

14 hours ago

mt. baker highway winter...

KIRO 7 News Staff

Mt. Baker Highway closed Wednesday and Thursday, prepping for winter

Both directions of Mt. Baker Highway (SR 542) will be closed on Wednesday, Sept. 30, and Thursday, Oct. 1, from 7:30 a.m. to 4 p.m.

14 hours ago

Bellevue speed camera ticket...

Jason Sutich

Drivers can now be ticketed by Bellevue’s 4 new speed cameras

The grace period for the four new speed safety cameras in Bellevue ended, meaning drivers can now be ticketed for any infractions in the newly monitored zones.

1 day ago

US 101 ramp I-5 boat crash...

MyNorthwest Staff

US 101 ramp to northbound I-5 reopened after vehicle towing a boat crashes Near Olympia

The US 101 ramp to northbound I-5 was blocked for several hours due to a collision involving a vehicle towing a boat.

2 days ago

US 2 monroe gold bar wsdot...

Chris Sullivan

15 months of construction about to start on US 2 between Monroe and Gold Bar

WSDOT has a laundry list of improvements for the corridor, including new sidewalks, adding new pedestrian crossings, adding new signs, rumble strips, and a new roundabout in Sultan.

2 days ago

sr 167 fatal motorcycle crash auburn...

Jason Sutich

Southbound SR 167 in Auburn reopens after fatal motorcycle crash

All lanes of southbound SR 167 north of SR 18 in Auburn have reopened after a fatal collision Monday afternoon involving a motorcycle and a car.

2 days ago

Chip sealing putting a chip on drivers’ shoulders