CHOKEPOINTS

New exit from 520 bridge opens to the public

Jul 17, 2017, 6:21 AM | Updated: 9:15 am

Drivers who exit the 520 bridge at Montlake have a new exit.

Westbound State Route 520 drivers who exit at Montlake need to be prepared to do so much earlier on the new span, which connects the floating bridge to Montlake.

RELATED: New I-5 lanes open near notorious Tacoma Dome crawl

The exit is about a mile back from where you would expect it.

“You’ll be much higher than you were before, in fact, you won’t be able to see the exiting cars, you’ll just be going westbound on this new structure for about a mile and then you’ll still have the option of going to East Lake Washington Boulevard or Montlake,” said Washington State Department of Transportation spokesperson Steve Peer.

If you miss this new exit, you will have to detour all the way to Roanoke or I-5.

“You will have to get off at Roanoke and turn around, luckily there won’t be any new tolls, but it’s going to be a pain and you don’t want to do that,” Peer said.

This configuration will last about a month or so before the westbound span opens to all westbound traffic. That will make three lanes between I-405 and Montlake in that direction, but it won’t last long.  That new span will go back down to two lanes in the westbound direction in about a year. That’s when the eastbound lanes will share that new span until the new eastbound span is complete. That should take four or five years.

And we’re just getting going on the 520 construction.

“It could be a decade,” Peer said of how long we still have before this 520 project is complete. “A lot of people, when we opened the floating bridge, said, ‘Oh, 520 is done,’ and really we’re just beginning.”

There is a laundry list of items left to finish before WSDOT puts a bow on 520. The entire Montlake interchange is going to be redone, including a lid over the roadway and a new pedestrian path connecting to the arboretum. The state still needs to build new bridges over Portage Bay to connect Montlake to I-5. That will finally extend three lanes all the way from I-405 to I-5, which will also include a new lid at Roanoke.

The final piece will be a new Montlake drawbridge over the cut. It will be built next to the existing one, and each span will handle one direction of traffic.

Tell Chris about a Chokepoint or ask a traffic question @kirortraffic via Twitter.

Chokepoints

sr 167 fatal motorcycle crash auburn...

Jason Sutich

Southbound SR 167 in Auburn reopens after fatal motorcycle crash

All lanes of southbound SR 167 north of SR 18 in Auburn have reopened after a fatal collision Monday afternoon involving a motorcycle and a car.

15 hours ago

kent drive-by shooting...

Jason Sutich

2 dead after drive-by shooting near I-5 overpass in Kent; road closed in both directions

A drive-by shooting near the S 272nd Street overpass above I-5 in Kent killed 2 people Monday, shutting down the road in both directions as police investigate.

17 hours ago

ritzville i-90 closed visibility...

Jason Sutich

I-90 in Ritzville reopens after dust storm caused multiple collisions

I-90 in Ritzville has reopened after both directions were blocked Friday due to multiple collisions.

3 days ago

super load marysville...

Chris Sullivan

Super load stuck on I-5 south in Marysville should move tonight

A truck carrying a massive pre-fab building has been parked along the southbound I-5 ramp at 88th St. in Marysville for three days.

4 days ago

closure (1)...

MyNorthwest Staff

I-5 reopens in both directions between Maytown and Tumwater

I-5 has reopened in both directions in Thurston County at milepost 97, KIRO Newsradio confirmed.

4 days ago

oyster run anacortes...

Nate Connors

43rd annual Oyster Run returns this weekend in Anacortes

The Oyster Run welcomes thousands of motorcyclists to Skagit County by Figaldo Bay. It's loud, it's proud, and it takes over Anacortes this time each year.

4 days ago

New exit from 520 bridge opens to the public