CHOKEPOINTS

What’s next for the 1-year-old 520 floating bridge

Apr 25, 2017, 2:41 PM | Updated: 2:42 pm

The new State Route 520 floating bridge opened a year ago Tuesday.

RELATED: Changes to I-90 over Lake Washington are coming

Though the bridge is carrying about 77,000 vehicles per day over Lake Washington, there is plenty of work left to do on the record-breaking monument of civil engineering.

This summer, the West Approach bridge North is expected to open to traffic. The 1.2-mile-long bridge will carry westbound traffic from the floating bridge to Montlake. The bicycle and pedestrian path will also be extended across Lake Washington.

The current west approach bridge is vulnerable to seismic shaking. Its four-lane road has narrow shoulders and no transit/HOV lanes, or a bicycle/pedestrian path.

In 2018, the state plans to break ground on the Montlake phase of construction. Crews will build a West Approach Bridge South to carry eastbound traffic from Montlake to the floating bridge.

A landscaped lid will also be built over SR 520 in Montlake to “further improve connections for transit, pedestrians, and bicyclists.

Plans are also underway for the replacement of the bridge’s Portage Bay Bridge between Montlake and I-5, as well as adding a second drawbridge over the Montlake Cut, south of University of Washington.

Chokepoints

SR 164 enumclaw fatal crash...

Jason Sutich

Two drivers killed in head-on crash on SR 164 near Enumclaw

Two people died after a collision on SR 164 near Enumclaw that closed the road in both directions for more than four hours early Monday morning.

4 hours ago

montlake pedestrian bridge sr 520...

Nate Connors

Montlake pedestrian bridge closes for a week at SR 520

Pedestrians and bicyclists at Montlake will need to navigate a detour crossing over SR 520 for a full week, beginning Monday, Oct. 19, at 7 a.m.

5 hours ago

Sound Transit budget deficit delays...

Michael Strite

Sound Transit to host community forum after Ballard light rail delayed to 2042

Sound Transit is encouraging Seattle residents to speak up about the proposed light rail extension to the Ballard neighborhood.

5 hours ago

SR 18 crash tiger mountain...

Frank Sumrall

All westbound SR 18 lanes reopen after crash near Tiger Mountain summit

All westbound lanes of SR 18 were blocked at I-90 in Snoqualmie for nearly an hour due to a crash near the Tiger Mountain summit.

6 hours ago

I-405 (3)...

Nate Connors

WSDOT projects over the weekend include another closure on I-405

The good news is this weekend's list of WSDOT projects is substantially shorter. The bad news is we have another full closure on I-405.

3 days ago

northbound I-5 crash...

MyNorthwest Staff

Northbound I-5 reopened after crash at Michigan Curve

Four lanes are blocked on northbound I-5 due to a crash on Friday.

3 days ago

What’s next for the 1-year-old 520 floating bridge