MYNORTHWEST NEWS

Toilets use rainwater in new government building in Seattle

Nov 26, 2012, 12:46 PM | Updated: 1:06 pm

Toilets that flush using rainwater, construction with reclaimed timber and lighting mostly through ...

Toilets that flush using rainwater, construction with reclaimed timber and lighting mostly through windows are some of the features of the new $72 million, state-of-the-art headquarters of the Seattle District of the U.S. Army Corps of Engineers. (Image courtesy ZGF Architects)

(Image courtesy ZGF Architects)

Toilets that flush using rainwater, construction with reclaimed timber and lighting mostly through windows are some of the features of the new $72 million, state-of-the-art headquarters of the Seattle District of the U.S. Army Corps of Engineers.

The 209,000 square foot Federal Center South Building is built at the site of an industrial brownfield warehouse as part of the U.S. General Services Administration’s Design Excellence program, which aims to promote a clean energy economy.

The building has a distinctive U-shape that surrounds a central atrium. The government expects the new Army Corps district office to be the most energy efficient air conditioned building in the region, using 100 percent outside air, underfloor ventilation and heat recovery “optimized via the atrium.”

ZGF Architects, of Seattle, which worked on the design-build project with Sellen Construction said it expects the new facility will earn a top energy efficiency certification from the U.S. Green Building Council.

Other energy-sustaining features of the building include a 25,000 gallon cistern which stores rainwater from the rooftop for toilets and irrigation, 300,000 board feet of reclaimed timber and a 50 percent reduction in impervious surfaces through landscaping.

The construction was funded by the 2009 American Recovery and Reinvestment Act.

MyNorthwest News

orcas island ferry...

KIRO 7 News Staff

New vehicle restrictions at the Orcas Island ferry terminal due to bridge structural concerns

Heads up to drivers who use the Orcas Island ferry terminal. During a recent inspection, engineers found cracks in the steel under the transfer span.

11 minutes ago

sound transit crosslake connection...

Julie Berg, KIRO 7

Sound Transit Crosslake Connection will be closed this weekend

Buses will replace Sound Transit Two Line trains between South Bellevue and International District/Chinatown on Saturday, Nov. 14 and Sunday, Nov. 15.

17 minutes ago

pedestrian bridge...

Chris Sullivan

Shoreline pedestrian bridge delayed as Seahawks fans embrace light rail

It looks like light rail riders will not be getting their pedestrian bridge over I-5 in Shoreline on time. The project is now running behind schedule.

38 minutes ago

transgender...

Julia Dallas

Seattle School Board authorizes potential legal action over transgender girls’ sports ban

The Seattle School Board authorized potential legal action over Initiative 638, which will bar transgender girls from competing in girls’ school sports.

8 hours ago

_involuntary treatment system...

James Lynch

‘Needs to be improved’: Report targets gaps in WA’s involuntary treatment system

A statewide task force is calling for changes to Washington’s Involuntary Treatment Act (ITA) system.

11 hours ago

school bus school districts...

KIRO Newsradio staff

3 WA school districts prepare to sue state over funding

Three Washington school districts are preparing to sue the state over education funding.

11 hours ago

Toilets use rainwater in new government building in Seattle