CHOKEPOINTS

This road project is going to add 45 minutes to area drives

Apr 12, 2016, 7:38 AM

The White River bridge between Enumclaw and Buckley will be closed for a week forcing drivers to ta...

The White River bridge between Enumclaw and Buckley will be closed for a week forcing drivers to take alternate routes. (The Tire Zoo)

(The Tire Zoo)

Drivers who use State Route 410 between Enumclaw and Buckley should make plans now to navigate around a full closure of the White River Bridge. This is going to add about 45 minutes to your drive for about a week.

Construction crews will close the bridge at 10 p.m. Friday, April 15 and hopefully reopen the bridge by noon on Saturday, April 23. Luckily, no events are currently scheduled at the White River Amphitheatre during the White River Bridge closure.

During the closure, drivers must use a detour route like SR 164, SR 18, SR 167 or SR 410. And that will likely take about 45 minutes longer, depending on traffic.

“We know this is going to be difficult for a lot of people who are used to a quick trip between Buckley and Enumclaw, but it’s really important we fix the bridge before the summer travel season heats up,” said Project Engineer Mike Askarian.
Due to the nature of the repairs and narrow width of the structure, pedestrians and cyclists will not be allowed to cross the White River Bridge during the work.

Drivers can call the project hotline at 253-372-3933 for more information.

Chokepoints

Bellevue speed camera ticket...

Jason Sutich

Drivers can now be ticketed by Bellevue’s 4 new speed cameras

The grace period for the four new speed safety cameras in Bellevue ended, meaning drivers can now be ticketed for any infractions in the newly monitored zones.

17 hours ago

US 101 ramp I-5 boat crash...

MyNorthwest Staff

US 101 ramp to northbound I-5 reopened after vehicle towing a boat crashes Near Olympia

The US 101 ramp to northbound I-5 was blocked for several hours due to a collision involving a vehicle towing a boat.

21 hours ago

US 2 monroe gold bar wsdot...

Chris Sullivan

15 months of construction about to start on US 2 between Monroe and Gold Bar

WSDOT has a laundry list of improvements for the corridor, including new sidewalks, adding new pedestrian crossings, adding new signs, rumble strips, and a new roundabout in Sultan.

22 hours ago

sr 167 fatal motorcycle crash auburn...

Jason Sutich

Southbound SR 167 in Auburn reopens after fatal motorcycle crash

All lanes of southbound SR 167 north of SR 18 in Auburn have reopened after a fatal collision Monday afternoon involving a motorcycle and a car.

2 days ago

kent drive-by shooting...

Jason Sutich

2 dead after drive-by shooting near I-5 overpass in Kent; road closed in both directions

A drive-by shooting near the S 272nd Street overpass above I-5 in Kent killed 2 people Monday, shutting down the road in both directions as police investigate.

2 days ago

ritzville i-90 closed visibility...

Jason Sutich

I-90 in Ritzville reopens after dust storm caused multiple collisions

I-90 in Ritzville has reopened after both directions were blocked Friday due to multiple collisions.

4 days ago

This road project is going to add 45 minutes to area drives