CHOKEPOINTS

Vantage Bridge work is back for a third season — here’s how to avoid the delays

Mar 26, 2026, 5:01 AM | Updated: 2:50 pm

Vantage Bridge...

Construction crews work on the Vantage Bridge. (Photo courtesy of WSDOT)

(Photo courtesy of WSDOT)

Like daily $15 tolls and backups across the Ship Canal Bridge, the delays on I-90 across the Vantage Bridge are back. Better weather is back, and construction is impacting your drives.

Construction on the Vantage Bridge over the Columbia River started up again earlier this year, and contractors blocked one lane in each direction of I-90. It wasn’t a big deal until last weekend when the weather was nice, and a lot of people were driving back and forth. The congestion was so bad that the Washington State Department of Transportation (WSDOT) had to issue a travel alert to remind people of the delays and the construction.

This is the third season of work on the bridge, replacing the concrete panels and working on the columns.

“We’ve installed over 266 panels out of a little over 600. In addition to that, we’ve done more than 80% of the work on the bridge piers,” WSDOT spokesperson Summer Derrey said. “We’ve made significant progress.”

There are still two construction seasons left before the work is complete. That’s 2028.

The lane restrictions start several miles to the east and west of the bridge, and the delays can extend significantly to the merge. The best advice is to avoid the middle of the day.

“If you want to avoid them, definitely go a day or two before, a day or two after, or really, really early in the morning or really late at night,” Derrey said. “The peak time is typically from about noon to 6 p.m., which you want to avoid.”

How to plan around Vantage Bridge delays

It’s terrible eastbound on Friday afternoons and westbound on Sunday afternoons.

If you’re heading east, don’t be tempted to use the Old Vantage Highway to get around the backups. It just can’t handle the capacity, and you’ll sit in long delays trying to get back onto the freeway.

“The main reason why I don’t recommend it is when you’re connecting back onto I-90 onto the bridge, when you’re headed eastbound, that’s where the pinch point is,” Derrey said. “You’re compounding the backup that already exists on I-90 by trying to get in.”

These lane restrictions are in place 24 hours and day. They will remain blocked until the weather turns bad later in the year, likely November. Work will stop, and all lanes will reopen for Memorial Day weekend, the 4th of July weekend, and Labor Day weekend.

A little bonus this year for soccer fans, the lane restrictions will be lifted from Memorial Day through the Fourth of July. A full six weeks of open lanes for the World Cup.

“The bad news is it looks like the Gorge concert venue has some really good concerts this summer, and we can’t open it up to all four lanes for every single concert,” Derrey said.

It’s going to be another nice weekend coming up, so be sure to plan your trip to eastern Washington with this in mind.

Chris Sullivan is a traffic reporter for KIRO Newsradio. Read more of his stories here. Follow KIRO Newsradio traffic on X.

Chokepoints

US 2 road rage shooting...

KIRO 7 News Staff

State Patrol investigating possible road rage shooting on US 2

All eastbound lanes of US 2 at Homeacres Road in Everett were closed for several hours as WSP investigated a possible road rage shooting.

4 hours ago

corn I-5 semi-truck crash...

Frank Sumrall

Corn spills across I-5 after semi-truck crashes near JBLM, exit 123 closed

The southbound I-5 exit to Thorne Lane/JBLM has been shut down early Thursday morning after a semi-truck carrying corn crashed into a ditch.

4 hours ago

Hood Canal Bridge...

Chris Sullivan

Stuck after a Hood Canal Bridge opening? New traffic signal aims to help

A new traffic signal near the Hood Canal Bridge will create gaps in post-opening gridlock so trapped residents can get out of their neighborhoods.

5 hours ago

Sound Transit budget deficit delays...

John Curley Show

‘Almost no accountability’: Transportation expert says Sound Transit is ‘building for the past’ amid ballooning budget

KIRO host John Curley, a longtime skeptic of public transportation and its ballooning costs, brought on Charles Prestrud to discuss where Sound Transit went wrong.

2 days ago

SR 202...

Chris Sullivan

SR 202 near Fall City to close this weekend for emergency river embankment repairs

Work is moving to SR 202 near Fall City this week, creating a 16-mile detour for people trying to get around the area.

2 days ago

SR 20...

KIRO 7 News Staff

Westbound SR 20 closed for a semi-truck off the road

According to Trooper Kelsey Harding, shortly before 6:30 p.m. Monday, a semi-truck went off the road on SR 20 just east of SR 9.

3 days ago

Vantage Bridge work is back for a third season — here’s how to avoid the delays