49-mile stretch of US 2 remains closed through weekend after mudslides, flooding
Dec 12, 2025, 2:30 PM | Updated: 4:13 pm
A photo of a road closed sign. (Photo courtesy of KIRO 7)
(Photo courtesy of KIRO 7)
The 49-mile closure on US 2 between Skykomish, milepost 50, and Leavenworth, milepost 99, will remain closed through the weekend, the Washington State Department of Transportation (WSDOT) announced Friday.
(1/3) US 2 Stevens Pass will remain closed through the weekend between Skykomish and Leavenworth (MP 50-99) due to water and debris over the road in multiple locations. There is no estimated time to reopen. US 97 Blewett and SR 28 through Quincy are alternate routes. @wspd6pio pic.twitter.com/B0pMR3CCJf
— WSDOT East (@WSDOT_East) December 13, 2025
The powerful atmospheric river that has battered the Pacific Northwest for days has created mudslides, guardrail damage, and water over sections of the highway.
Thousands remain without power, city events cancelled from flooding
Large portions of Leavenworth and Chelan County are currently without power. The City of Leavenworth issued a joint press release with the Leavenworth Chamber of Commerce confirming that Village of Lights festivities have been cancelled for this weekend.
At this time, alternative routes for cross-state travel are available using I-90 Snoqualmie Pass, US 97 Blewett Pass, State Route 28 through Quincy, and US 12 over White Pass. With more precipitation in the forecast, travel conditions may change on short notice.
WSDOT plans to survey damage on Monday, Dec. 15.
Nate Connors is a traffic reporter for KIRO Newsradio. Follow him on X. Read more of his stories here. Submit news tips here.



