SEATTLE NEWS ARCHIVES & FEATURES

What you need to know during 10 weeks of light rail closures, construction

Jan 2, 2020, 9:26 AM

Connect 2020 is Sound Transit’s project to connect light rail in the downtown corridor. There’s a lot to look out for when it comes to the next 10 weeks with the construction, and the changes riders are going to see.

What bike riders need to know during 10 weeks of light rail disruptions

That includes shuttle buses, no more bikes, and a new temporary platform at Pioneer Square. Let’s walk through what to expect starting this weekend.

Link shuttle buses are going to replace trains between Capitol Hill and SoDo. There will be a few other weekends with that same closure — one from Feb. 8-9, and another from March 14-15. You can stay up to date on ongoing closures by subscribing to text alerts from Link light rail here.

If you think the trains are going to come as frequently as they typically do, prepare for delays. Four-car trains are going to arrive every 12 minutes during all service hours.

Bikes will not be allowed at the Pioneer Square Station, situated directly between the International District and University Street Stations. That being so, cyclists won’t be completely out of luck, with a protected bike lane providing a safe way around that route.

Prepare for a commute change on Sound Transit’s Link light rail

During this construction, Link light rail is going operate as two lines: Angle Lake to Pioneer Square, and University of Washington to Pioneer Square. If you want to continue past Pioneer Square, you’re going to have to get off the train through the inner doors, and go across across the temporary platform.

Sound Transit will have ambassadors out on the tracks to help direct riders across those areas. If you want to exit at Pioneer Square, you’re going to use the outer doors facing the permanent platform.

I’ll be watching train schedules for potential delays, and will keep you up to speed every afternoon from 3 p.m. to 7 p.m. on The Candy, Mike and Todd Show on KIRO Radio.

Seattle News Archives & Features

A car engulfed in flames on the Stewart/Denny Exit of southbound I-5 delayed the opening of the Exp...

Tom Brock

Car fire delays northbound opening of Express Lanes in Seattle

On the I-5 southbound express lanes off-ramp to Stewart St (MP 166) there is a disabled vehicle blocking the ramp.

6 days ago

king tides...

Ted Buehner, KIRO Newsradio Meteorologist

King Tides to bring risk of flooding and damage to low-lying coastal areas

 The winter months are when the marine waters of Western Washington bring King Tides and the risk of flooding and damage.

6 days ago

Seattle-based Snow & Co. delivered the first-of-eight battery-powered electric ship-assist tugs to ...

Tom Brock

Goodbye diesel: Seattle builder delivers its first all-electric tugboat

A Seattle-based shipbuilding company sent its first, all-electric tugboat to one of its customers on Sunday.

6 days ago

Fire crews respond to a helicopter hard landing after the aircraft's engine reportedly lost power n...

Tom Brock

Two aircraft emergencies in Pierce County Saturday

Two aircraft emergencies in Pierce County Saturday resulted in injuries to one pilot. 

20 days ago

This NOAA satellite image shows the magnitude of the storm moving inland from the Pacific Ocean. (P...

Ted Buehner, KIRO Newsradio Meteorologist

What to expect as Western Washington’s first big fall storm arrives Saturday night

The fall season’s first strong weather system will sweep through Western Washington tonight, bringing strong winds and rain.

21 days ago

Associated Press

3 dead, including suspect, and 2 deputies critically injured in eastern Washington state

SPOKANE COUNTY, Wash. (AP) — A shooting and subsequent firefight with responding officers left three people dead, including the suspect, and two deputies critically wounded in eastern Washington state Tuesday. Deputies responded to a home in Spokane County, which borders Idaho, around 2:30 p.m. after a woman told her neighbor that she had been shot […]

24 days ago

What you need to know during 10 weeks of light rail closures, construction