CHOKEPOINTS

Expect construction delays on 520 bridge this weekend

Feb 12, 2016, 11:18 PM | Updated: May 6, 2016, 11:19 pm

If you plan on using the 520 floating bridge to cross Lake Washington this weekend, make other plans.

Crews will shut down the bridge in both directions from 11 p.m. Friday, Feb. 12, to 5 a.m. Saturday, Feb. 13.

The Washington State Department of Transportation will close all lanes and ramps of SR 520 between Montlake Boulevard and 92nd Avenue Northeast. Expect delays on the alternate routes.

On Saturday morning, you’ll see new toll-rate signs near 84th Avenue Northeast.

Once the new 520 bridge is in its final lane configuration, the toll equipment will move to a permanent location just east of the Evergreen Point lid.

Chokepoints

Bellevue speed camera ticket...

Jason Sutich

Drivers can now be ticketed by Bellevue’s 4 new speed cameras

The grace period for the four new speed safety cameras in Bellevue ended, meaning drivers can now be ticketed for any infractions in the newly monitored zones.

19 hours ago

US 101 ramp I-5 boat crash...

MyNorthwest Staff

US 101 ramp to northbound I-5 reopened after vehicle towing a boat crashes Near Olympia

The US 101 ramp to northbound I-5 was blocked for several hours due to a collision involving a vehicle towing a boat.

24 hours ago

US 2 monroe gold bar wsdot...

Chris Sullivan

15 months of construction about to start on US 2 between Monroe and Gold Bar

WSDOT has a laundry list of improvements for the corridor, including new sidewalks, adding new pedestrian crossings, adding new signs, rumble strips, and a new roundabout in Sultan.

1 day ago

sr 167 fatal motorcycle crash auburn...

Jason Sutich

Southbound SR 167 in Auburn reopens after fatal motorcycle crash

All lanes of southbound SR 167 north of SR 18 in Auburn have reopened after a fatal collision Monday afternoon involving a motorcycle and a car.

2 days ago

kent drive-by shooting...

Jason Sutich

2 dead after drive-by shooting near I-5 overpass in Kent; road closed in both directions

A drive-by shooting near the S 272nd Street overpass above I-5 in Kent killed 2 people Monday, shutting down the road in both directions as police investigate.

2 days ago

ritzville i-90 closed visibility...

Jason Sutich

I-90 in Ritzville reopens after dust storm caused multiple collisions

I-90 in Ritzville has reopened after both directions were blocked Friday due to multiple collisions.

4 days ago

Expect construction delays on 520 bridge this weekend