CHOKEPOINTS

Washington State Ferries launches largest hybrid-electric ferry in North America

Jul 10, 2025, 5:52 PM

Washington state ferries wenatchee hybrid-electric ferry sea trials WSF sick out...

Washington State Ferries converted the Wenatchee to its first hybrid-electric ferry. (Photo: James Lynch, KIRO Newsradio)

(Photo: James Lynch, KIRO Newsradio)

Washington State Ferries took delivery of its first hybrid-electric ferry.

The Wenatchee, already one of the largest boats in the fleet, is now the most technologically advanced ferry in the fleet. The conversion cost $133 million and makes the Wenatchee the largest hybrid-electric ferry in all of North America.

“We’ve made a decision to transition away from that dirty fuel, and that climate change gas, and we’re doing it right here on the Wenatchee,” former Washington Governor Jay Inslee said.

Inslee joined current Washington Governor Bob Ferguson for a tour aboard the Wenatchee along with members of the media.

Washington State Ferries’ hybrid-electric ferry conversion

During the conversion, two of the Wenatchee’s four diesel engines and two generators were removed. Meanwhile, two battery rooms and 864 batteries were added.

“The Wenatchee is now the largest hybrid-electric ferry in the entire country. It has a 202-vehicle capacity,” Ferguson said.

The Wenatchee is expected to burn 25% less diesel. Once shore charging is installed at the docks, as early as 2029, the Wenatchee will reduce greenhouse emissions by up to 95% and burn up to one million fewer gallons of diesel each year.

“We’re leading the world in a decarbonized, maritime fleet starting right here with the Wenatchee,” Inslee said.

The ferry operates similarly to most hybrid vehicles. When the Wenatchee is running under diesel power, the batteries are charged. When the battery’s charge reaches a certain level, the diesel engines shut off and the electric motors take over. This results in a much smoother ride for passengers and significantly less vibration, which is less physically taxing on the crew.

Washington state ferries wenatchee hybrid-electric ferry (1)

Washington State Ferries converted the Wenatchee to its first hybrid-electric ferry. (Photo: James Lynch, KIRO Newsradio)

And the news gets better, especially for those who use the ferries regularly.

“Bringing the Wenatchee back online is the final piece of the puzzle to restoring full domestic service to pre-pandemic levels,” Ferguson said.

Inslee called it a major point of pride for all Washingtonians, whether they use the ferries or not.

“It’s got the most advanced electric propulsion system ferry, not just in Washington, not just in America, but in all of North America,” Inslee said.

The Wenatchee will officially go back into service next week. It will provide service between Seattle and Bainbridge Island.

Follow James Lynch on X. Read more of his stories here. Submit news tips here.

Please follow our Community Guidelines

Chokepoints

ferry terminal repairs orcas island...

MyNorthwest Staff

Orcas Island ferry terminal repairs could take 2 weeks as large vehicles remain restricted

Repairs to the Orcas Island ferry terminal’s transfer span could take up to two weeks after engineers found cracks in two supporting steel beams.

7 hours ago

Sound Transit light rail car stuck...

Frank Lenzi

Car gets stuck near Rainier Beach station in Seattle’s second light rail track incident this year

For the second time this year, a car got stuck on Seattle light rail tracks.

9 hours ago

Box truck rollover blocks four southbound I-5 lanes in DuPont...

Jason Sutich

SB I-5 reopens near DuPont after box truck rollover blocks 4 lanes

A rolled-over box truck is blocking the four left lanes of southbound I-5 in DuPont early Tuesday morning.

19 hours ago

sound transit crosslake connection...

Julie Berg, KIRO 7

Sound Transit Crosslake Connection will be closed this weekend

Buses will replace Sound Transit Two Line trains between South Bellevue and International District/Chinatown on Saturday, Nov. 14 and Sunday, Nov. 15.

20 hours ago

pedestrian bridge...

Chris Sullivan

Shoreline pedestrian bridge delayed as faulty arch may need replacement

It looks like light rail riders will not be getting their pedestrian bridge over I-5 in Shoreline on time. The project is now running behind schedule.

20 hours ago

road closed SR 167...

Nate Connors

SR 167 overnight closure kicks off week of roadwork in western WA

There is one full closure on Monday evening on SR 167 through Renton that drivers will need to pay attention to and seek alternate routes.

1 day ago

Washington State Ferries launches largest hybrid-electric ferry in North America