November 10th, 2026

Shoreline Pedestrian Bridge Delayed—Manufacturing Issues

Two big updates: the Shoreline pedestrian bridge over I-5 is delayed after a manufacturing issue with one of the arches. And Eastside Seahawks fans are packing the 2 Line on game days—3,500 boarding at South Bellevue each game. Get there early, garages fill fast. #chokepoints

Chris Sullivan

Sully